The panels often go up in a day or two, but the paperwork around them takes longer. Knowing the order helps you spot delays.
The usual sequence
- Site survey and final design. The installer confirms measurements, the electrical panel and roof structure.
- Permit application. The installer files plans with your city or county, and with your homeowners association if one applies.
- Utility application. Many utilities require an interconnection application before or during construction.
- Installation. Panels, racking, wiring and the inverter go in.
- Inspection. A local inspector checks the work against code.
- Permission to operate. The utility approves the connection, sometimes after swapping the meter. Only then should the system be switched on.
How long it takes
Timelines vary widely by city, utility and season. Some projects finish in a few weeks, and others take a few months, mostly because of waiting on approvals. Ask for an expected timeline in writing and for the name of who tracks it.
Who should handle what
Most installers file permits and the utility application for you. Make sure the contract says so and says who pays any permit or meter fees. It should also say what happens if your panel needs an upgrade to carry the new system.
Warning signs
- An installer who asks you to switch the system on before approval.
- No permit number you can look up with your city.
- Vague answers on who contacts the utility.
Keep reading
General information, not financial, tax or engineering advice. Last reviewed November 19, 2026.
Ready to talk to an installer?
If you own your home and are thinking about solar for your home, one call connects you with an available independent provider for a quote. No obligation.